                  MasTec | Infrastructure that Delivers Leading specialty contractor engineers, designs and constructs infrastructures for electric power generation and transmission, oil and natural gas pipelines, renewable energy facilities and wireless networks.
                  Power Generation icon

                  Pioneer Generation Station

                  Natural Gas Peaking Station | Williston, ND

                  Scope of Work

                  Wanzek was the EPC contractor for the 45 megawatt General Electric LM6000 combustion turbine generator peaking unit for the Pioneer Generation Station located near Williston, ND. Wanzek was responsible for completing the engineering (civil, electrical, and mechanical) and the balance of plant work for all equipment and controls to support the plant. The natural-gas-fired peaking station will primarily be used to support the local transmission systems and serve loads developing in the area.

                  Services Employed

                  • Engineering
                  • Civil
                  • Electrical Mechanical
                  • Structural Steel Equipment Setting

                  Services Provided by:

                  Related Projects

                  Meadow Creek
                  Power Generation icon

                  Meadow Creek

                  Wind Farm

                  Bonneville County, ID
                  Biomass Gasifier Project
                  Power Generation icon

                  Biomass Gasifier Project

                  Ethanol Plant Expansion

                  Benson, MN
                  Wind Farm Construction - 51MW
                  Power Generation icon

                  Wind Farm Construction - 51MW

                  Wind

                  Burlington, CO